Upcoming ASME short courses


MARRIOTT MISSION VALLEY, SAN DIEGO


"The Bolted Joint," Jan. 13-14.
"ASME Section VIII, Division 1, Design and Fabrication of Pressure Vessels," Jan. 13-15.
"ASME B31.3, Process Piping," Jan. 13-16.
"ASME Section VIII, Division 1, Design and Fabrication of Pressure Vessels (includes Inspections, Repairs and Alterations)," Jan. 13-17.
"Design of Bolted Flange Joints," Jan. 15.
"ASME B31.8, Gas Transmission and Distribution Piping Systems," Jan. 15-16.
"ASME B31.4, Liquid Pipelines Integrity," Jan. 16-17.
"Fundamentals of Fastening Systems," Jan. 16-17.
"Inspections, Repairs, and Alterations of Pressure Vessels," Jan. 16-17.
"ASME B31.3, Fabrication and Examination," Jan. 17.


OMNI CNN CENTER HOTEL, ATLANTA

"Centrifugal Pump Design and Application Seminar," Jan. 27-28.
"The Layout of Piping Systems and Process Equipment," Jan. 27-28.
"Flow-Induced Vibration With a New Calculations Workshop," Jan. 27-29.
"ASME Section XI, Inservice Inspection of Nuclear Power Plant Components," Jan. 27-31.
"Failure, Failure Prevention, and Repair of Pressure Vessels, Piping, Boilers and Rotating Machinery, with Life-Extension Consideration," Jan. 28-30.


HARRAH'S LAS VEGAS

"Applied Bioprocess Design for Sterility and Cleanability," March 10-11.
"How to Predict Thermal-Hydraulic Loads on Pressure Vessels and Piping," March 10-11.
"ASME Section IX, Welding and Brazing Qualifications," March 10-12.
"Practical Welding Technology," March 10-12.
"Fracture Mechanics Approach to Life Prediction," March 10-12.
"ASME Section III, Division 1, Requirements for Design & Manufacturing of Nuclear Power Plant Components," March 10-13.
"ASME Section VIII, Division 2, Pressure Vessels," March 10-13.
"ASME B31.1, Process Piping Design and Fabrication," March 10-14.
"Combustion, Thermal Systems and Multipollutant of Air Emissions," March 12-14.


WYNDHAM GREENSPOINT, HOUSTON

"Turbulence Modeling, Industry Application," March 17-18.
"Failure Prevention in Steam Systems," March 17-18.
"Using Reliability Engineering Principles for Improved Process Performance," March 17-18.
"ASME Section VIII, Division 1, Design and Fabrication of Pressure Vessels," March 17-19.
"Introduction to Piping Systems and Process Equipment," March 17-19.
"Nondestructive Examination Applying ASME Code Requirements (Section V)," March 17-19.
"ASME B31.3, Process Piping," March 17-20.
"ASME Section VIII, Division 1, Design and Fabrication of Pressure Vessels (includes Inspections, Repairs and Alterations)," March 17-21.
"ASME B31.4, Liquid Pipelines Integrity," March 20-21.
"Inspection, Repairs and Alterations of Pressure Vessels," March 20-21.
"ASME B31.3, Fabrication and Examination," March 21.


ASME HEADQUARTERS, NEW YORK

"Introduction to Elevators and Escalators," March 24-25.
"Elevator Maintenance Evaluation," March 26-27.


HILTON PORTLAND, PORTLAND, ORE.

"Waterhammer and Fluid Structure Interaction in
Piping Systems," March 31-April 1.
"Project Management for Engineers and Technical Professionals," March 31-April 2.
"Shock and Vibration Analysis," March 31-April 2.
"Pump & Valve Selection for Optimum System Performance," March 31-
April 3.
"ASME B31, Piping Fabrication and Examination," April 1-2.
"Team Leadership and Facilitation for Engineers and Technical Professionals," April 1-2.

To register, or for additional information, visit www.asme.org/education, or call (800) 843-2763 or (973) 882-1167.

 


back to meetings & courses

 

front page | features | columns | meetings & courses | milestones | calendar | ME Magazine
about ASME NEWS | ASME.ORG | ME Magazine Online | news update | ASME NEWS archive
© 2002 by The American Society of Mechanical Engineers