Upcoming ASME short courses
Grosvenor Resort, Orlando, Fla.
April 7-8: ASME A17.3 Elevator and Escalator Code: ASME A17.1, Part
XII, Requirements for
Alteration, Maintenance and Existing Installations
April 7-8: B31 Piping Fabrication and Examination
April 7-8: The Layout of Piping Systems and Process Equipment
April 7-9: Combustion, Thermal Systems & Multipollutant of Air Emissions
April 7-9: Winning Operations Management Skills
April 7-10: Advanced Design and Fabrication of Pressure Vessels
April 8-11: ASME A17.1 Safety Code for Elevators & Escalators
April 9-11: Turbo-machinery Components and Systems: Dynamic Analysis
April 10: How to Find the Path to Become a World Class Performer
Harrah's Las Vegas
April 28-29: Computational Heat Transfer and Thermal Analysis
April 28-29: Liquid Pipeline Hydraulics, Level 1 Introduction
April 28-29: Thermoeconomics: Efficiency vs. Cost
April 28-30: Heating, Ventilating, and Air-Conditioning Systems: Sizing
and Design
April 30-May 1: Liquid Pipeline Hydraulics, Level 2
May 1: Understanding Chiller Performance, Operation and Economics
Marriott Mission Valley, San Diego
May 5-7: API 579: Recommended Practice for Fitness-for-Service and Continued
Operation of Equipment
May 5-6: Combustion, Thermal Systems & Multipollutant of Air Emissions
May 5-6: Lean Manufacturing: Designing Manufacturing Cells
May 5-7: ASME Y14.5 Geometric Dimensioning and Tolerancing: Level 1
May 5-7: Computational Fluid Dynamics: Engineering Analysis and Applications
May 5-8: Seismic Design & Retrofit of Process/Power Plant Fluid
Systems
May 8-9: Tolerance Stack-Up
Wyndham Greenspoint Hotel, Houston
May 5-6: Application of Standards in Boiler, Pressure Vessels, and Piping
Codes
May 5-7: ASME Section IX, Welding and Brazing Qualifications
May 5-7: Failure, Failure Prevention & Repair of Pressure Vessels,
Piping, Boilers & Rotating Machinery, with Life-Extension Considerations
May 5-7: Flow Induced Vibration with a New Calculations Workshop
May 5-8: Advanced Design and Fabrication of Pressure Vessels
May 5-9: ASME Section XI, Inservice Inspection of Nuclear Power Plant
Components
May 7-8: ASME B31.8 Gas Transmission and Distribution Piping Systems
May 7-9: The Theory of Inventive Problem Solving (TIPS/TRIZ)
Westin Hotel, Pittsburgh
June 2-3: The Bolted Joint
June 2-4: ASME Section VIII, Division 1 Design and Fabrication of Pressure
Vessel
June 2-4: Practical Welding Technology
June 2-4: Project Management for Engineers and Technical Professionals
June 2-5: ASME B31.3 Process Piping
June 3-4: Power Plant Steam Surface Condensers
June 4: Design of Bolted Flange Joints
June 5-6: Fundamentals of Fastening Systems
June 5-6: Inspection, Repairs and Alterations of Pressure Vessels
June 6: B 31.3 Fabrication and Examination
ASME International Headquarters, New York
June 9-10: Elevator Maintenance Evaluation
June 11: ASME A17.2.3 Escalators and Moving Walks Inspection and Maintenance
Evaluation Techniques
June 11-13: How to Perform Elevator Inspections Using ASME A17.2.1 and
A17.2.2
Omni Hotel at CNN Center, Atlanta
June 23-24: Failure Prevention in Steam Systems
June 23-24: The Gas Turbine: Principles and Applications
June 23-24: Turbulence Modeling for Industrial Applications
June 23-25: Creativity and New Product Development
June 23-25: Fracture Mechanics Approach to Life Predictions
June 23-25: Shock and Vibration Analysis
June 23-26: Pump and Value Selection for Optimum System Performance
June 23-27: ASME B31.1 Power Piping Design and Fabrication
June 26-27: Cost-Effective, Performance-Based Product Development
Hyatt Regency, Calgary, Alberta, Canada
July 14-15: Liquid Pipeline Hydraulics, Level 1 Introduction
July 14-15: The New Engineering Manager: Moving from Technical Professional
to Manager
July 14-15: Enhancing Presentation Skills for Engineers and Technical
Professionals
July 14-16: ASME Section VIII, Division 1 Design and Fabrication of
Pressure Vessels
July 14-16: API 579- Recommended Practice for Fitness-For-Service and
Continued
Operation of Equipment
July 14-16: ASME QFO Examination Preparation
July 14-16: Introduction to Piping & Process Equipment
July 14-16: Non Destructive Examination - Applying ASME Code Requirements
(Section V)
July 14-17: Seismic Design and Retrofit of Equipment and Piping
July 14-18: ASME Section VIII, Division 1 Design and Fabrication of
Pressure Vessels (includes Inspections, Repairs and Alterations)
July 14-18: Section XI, Inservice Inspection of Nuclear Power Plant
Components
July 15-17: Winning Operations Management Skills
July 16-17: Team Leadership & Facilitation for Engineers and Technical
Professionals
July 16-17: Risk Analysis and Management of Capital Projects
July 16-18: Turbo-Machinery Components And System: Dynamic Analysis
July 17-18: Application of Standards in Boiler, Pressure Vessels &
Piping Codes
July 17-18: Inspections, Repairs and Alterations of Pressure Vessels
(Section VII, Division 1)
July 18: How To Find The Path to Become A World Class Performer
ASME International Headquarters, New York
August 4-8: Successful Negotiation Skills For Engineering and Technical
Professionals
August 4-8: Strategic Planning for Engineers
August 6-7: Effective Communication Using MBTI for Engineers and Technical
Professionals
August 6-7: Cost-Effective Performance Based Product Development
Hilton Atlanta
Sept. 8-9: Elevator Control Technology
Sept. 8-9: Applied Bioprocess Design for Sterility and Cleanability
Sept. 8-10: ASME Section IX, Welding and Brazing Qualifications
Sept. 8-10: Project Management for Engineers & Technical Professionals
Sept. 8-10: ASME Y14.5M Geometric Dimensioning and Tolerancing: Level
1
Sept. 8-11: Pressure Vessels with Emphasis on Section VIII, Division
2
Sept. 8-11: ASME A17.1 Safety Code for Elevators and Escalators
Sept. 8-11: ASME B31.3 Process Piping
Sept. 10-11: A17.3 and ASME A17.1, Part XII Requirements for Alteration,
Maintenance and Existing Installations
Sept. 10-12: Shock and Vibration Analysis
Sept. 11-12: Tolerance Stack-Up
Sept. 11-12: Improving Working Relationships for Engineers and Technical
Professionals
Sept. 12: B31.3 Fabrication and Examination
Sept. 12: ASME A17.2.3 Escalators and Moving Walks Inspection and Maintenance
Evaluation Techniques
Embassy Suites, Phoenix
Sept. 15-16: Fundamentals of Fastening Systems
Sept. 15-16: B31 Piping Fabrication and Examination
Sept. 15-17: Heating, Ventilating, and Air-Conditioning Systems: Sizing
& Design
Sept. 15-17: Failure, Failure Prevention & Repair of Pressure Vessels,
Piping, Boilers and Rotating Machinery
Sept. 15-18: Pump and Value Selection for Optimum System Performance
Sept. 15-18: Mechanical Design of Process Plant Equipment
Sept. 16-19: Advanced Design and Fabrication of Pressure Vessels
Sept. 17: Design of Bolted Flange Joints
Sept. 17-19: Computational Fluid Dynamics (CFD): Engineering Analysis
& Applications
Sept. 18: Understanding Chiller Performance, Operation and Economics
Sept. 18-19: ASME B31.8 Gas Transmission and Distribution Piping Systems
Sept. 18-19: How to Predict Thermal-Hydraulic Loads on Pressure Vessels
and Piping
Sept. 18-19: ASME B31.4 Liquid Pipelines Integrity
Sept. 18-19: The Bolted Joint
Wyndham Greenspoint, Houston
Oct. 13-14: Stress Analysis and Computer Modeling of Process Plant Piping
Systems
Oct. 13-14: The Gas Turbine: Principles & Applications
Oct. 13-15: Flow Induced Vibration With Failure Analysis Considerations
Oct. 13-15: Turbo-Machinery Components And System: Mechanical Design
Oct. 13-15: ASME Section VIII, Division 1, Design and Fabrication
of Pressure Vessels
Oct. 13-15: The Theory of Inventive Problem Solving
Oct. 13-15: Fracture Mechanics Approach to Life Prediction
Oct. 13-16: ASME Section III, Division 1: Requirements for Design
& Manufacture of Nuclear Power Plant Components
Oct. 13-17: B31.1 Power Piping Design & Fabrication
Oct. 14-17: Operation, Maintenance, & Repair of Plant Piping
Systems
Oct. 16: Inventive Thinking for Engineers
Oct. 16-17: Using Reliability Engineering Principles for Improved
Process Performance
Oct. 16-17: Liquid Pipeline Hydraulics, Level 2
Oct. 16-17: Inspection, Repairs, & Alterations of Pressure Vessels
Oct. 15-17: Centrifugal Pump Design & Applications
Harrah's Hotel, Las Vegas
Nov. 3-4: Turbulence Modeling for Industrial Applications
Nov. 3-4: Thermoeconomics: Efficiency Vs. Cost
Nov. 3-4: Power Plant Steam Surface Condensers
Nov. 3-4: Mechanical Tolerancing for Six Sigma
Nov. 3-4: Failure Prevention in Steam Systems
Nov. 3-5: ASME Section IX, Welding and Brazing Qualifications
Nov. 3-6: Pressure Vessels with Emphasis on Section VIII, Division
2
Nov. 3-6: ASME B31.3 Process Piping
Nov. 4-6: The Layout of Piping Systems and Process Equipment
Nov. 5-6: Lean Manufacturing: Designing Manufacturing Cells
Nov. 5-6: Computational Heat Transfer and Thermal Modeling
Nov. 5-6: Design, Selection, and Sizing of Heat Exchangers
Nov. 5-6: Tools and Methods of Finite Element Analysis
Nov. 5-7: Practical Welding Technology
Nov. 7: B31.3 Fabrication and Examination
To register, or for additional information, visit www.asme.org/education,
or call (800) 843-2763 or (973) 882-1167.
back to meetings & courses